Home / Warehouse and racking
01 Warehouse and racking
Houston, DFW, Waco and Weatherford, plus out-of-state jobs.
Install
Pallet racking installation
→ The short version
S&T Management Group installs, tears down and reconfigures pallet racking, and builds the permit package that goes with it. That covers the high-piled storage submittal when more than 500 square feet of the building is used for high-piled combustible storage, and engineering stamps from licensed Texas professional engineers where the work needs a seal.
02 Services
Service
Commodity class, plan of storage, sprinkler basis and smoke removal, submitted and carried through review.
Read more
Service
Rack capacity, anchorage and seismic calculations sealed by licensed Texas professional engineers.
Read more
Service
Install, teardown and reconfiguration of new and used pallet racking.
Read more
Service
Permits and layout for solid-piled storage areas and sortation systems.
Read more
Service
Sprinkler work for storage areas, done by licensed S&T group trades.
Read more
Service
Lighting, power and air for the building, done by licensed S&T group trades.
Read more03 3D layout model
We build a layered 3D model of your racking from the floor plan, rack layout and photos you already have. Storage height, sprinkler clearance, flue spaces, aisles, egress and fire department access are each their own layer. We mark what is likely to draw a comment and walk you through it before the drawings go to the engineer for seal.
A planning and pre-check tool. It does not replace sealed engineering or the review of the fire code official.
04 How a job runs
| Step | Stage | What happens |
|---|---|---|
| 01 | Deposit | You sign the agreement and we book the work. |
| 02 | Drawings | We draw the layout and the plan of storage from what you store. |
| 03 | Stamp | Licensed Texas professional engineers seal the rack documents where required. |
| 04 | Submittal | We file the package with the fire code official and answer comments. |
| 05 | Approval | The permit is issued for the layout you will actually build. |
| 06 | Install | We install to the permitted plan, then the fire marshal inspects. |
Classify first. Bolt second. Installing first and permitting after is the most expensive order there is.
05 Where we work
Pick a metro to see the cities and counties we cover there.
06 Start
Floor plan, rack quote and a few photos are enough to start.
Direct
Brandon (254) 715-7282
Jon (682) 429-9717
S&T Management Group Inc
Weatherford, Texas
Where we work
DFW · Houston · Waco · Weatherford
— and out-of-state jobs